Advanced reports
VARI - build in advanced reports files
VARI advanced report files can enclose trends.
ME Indication - 6 cylinders
Poprzedni
Następny
ME Indication - 6 cylinders
Advanced report of measurements of burning pressure and exhaust gas temperatures of a 6-cylinder engine. The report contains defined trends for burning pressures for each cylinder.
ME Indication - 8 cylinders
Poprzedni
Następny
ME Indication - 8 cylinders
Advanced report of measurements of burning pressure and exhaust gas temperatures of a 8-cylinder engine. The report contains defined trends for burning pressures for each cylinder.
ME Indication - 9 cylinders
Poprzedni
Następny
ME Indication - 9 cylinders
Advanced report of measurements of burning pressure and exhaust gas temperatures of a 9-cylinder engine. The report contains defined trends for burning pressures for each cylinder.
Wire line condition checklist
Poprzedni
Następny
Wire line checklist
Advanced report for wire line condition inspection.
Synthetic line condition checklist
Poprzedni
Następny
Synthetic line checklist
Advanced report for synthetic line condition inspection.
Pilot, lifesaving ladder checklist
Poprzedni
Następny
Pilot, lifesaving ladder checklist
Advanced report for lifesaving ladder inspection.
Job layouts
Job layouts files
Job layouts files can enclose VARI advanced report files and trends as well.
ME - Indication (maximum burning pressure and temperature control) - 6 cyl. - 1W.
Previous slide
Next slide
ME - Indication (maximum burning pressure and temperature control) - 6 cyl. 1W
Predefined period – 1 week
Job layout with Advanced Report.
Main Engine indication report for pressure and temperature measurement for each cylinder. Designed for 6 cylinders engines.
Advanced report contains built-in pressure trends for each cylinder.
ME - Indication (maximum burning pressure and temperature control) - 8 cyl. - 1W.
Previous slide
Next slide
ME - Indication (maximum burning pressure and temperature control) - 8 cyl. 1W
Predefined period – 1 week
Job layout with Advanced Report.
Main Engine indication report for pressure and temperature measurement for each cylinder. Designed for 8 cylinders engines.
Advanced report contains built-in pressure trends for each cylinder.
ME - Indication (maximum burning pressure and temperature control) - 9 cyl. - 1W.
Previous slide
Next slide
ME - Indication (maximum burning pressure and temperature control) - 9 cyl. 1W
Predefined period – 1 week
Job layout with Advanced Report.
Main Engine indication report for pressure and temperature measurement for each cylinder. Designed for 9 cylinders engines.
Advanced report contains built-in pressure trends for each cylinder.
Wire line condition inspection - 250H.
Previous slide
Next slide
Wire line condition inspection - 250H
Predefined period – 250 mooring Hours
Job layout with Advanced Report.
Wire line condition inspection report. Scope of inspection acc. to MSC1-Circ1620.
Synthetic line condition inspection - 250H.
Previous slide
Next slide
Synthetic line condition inspection - 250H
Predefined period – 250 mooring Hours
Job layout with Advanced Report.
Synthetic line condition inspection report. Scope of inspection acc. to MSC1-Circ1620.
Pilot, lifesaving ladder condition inspection - 3M
Previous slide
Next slide
Pilot, lifesaving condition inspection - 3M
Predefined period – 3 months
Job layout with Advanced Report.
Pilot, lifesaving ladder condition inspection report. Scope of inspection acc. to ISO-799-2-2021.
Common Configurations
Common configuration files
Common configuration data used on all vessels and not synchronized on-line.
System functions access
System access functions
Configuration of access to program functions depending on the position.
Version date: 2023-11-03 (ver. 10.03)
Automation codes
Automation codes
Set of automation codes used VOYAGER automation jobs and layouts.
Version date: 2023-09-15
Component types
Components types
Configuration of the component types list.
Version date: 2023-09-15
Consumables
Consumables - predefined
Configuration of the predefined consumables list (8240 pcs)
Version date: 2023-09-15
Consumables groups
Consumables groups
Configuration of the 3 -level tree predefined consumables groups list.
Version date: 2023-09-15
Devices
Devices
Configuration of the devices list. Devices used for grupping jobs in Automation and Megatest Reports.
Version date: 2023-03-15
General departments
General departments
Configuration of the general departments list.
Version date: 2023-11-03
Tasks groups
Tasks groups
Configuration of the tasks groups list.
Version date: 2023-09-15
Ports
Ports
Configuration of the ports list (1559 pcs)
Version date: 2024-07-03
Transfer locations
Transfers locations
Configuration of the transfer locations list. Ships and ship’s departments
Version date: 2023-09-15
Units
Units
Configuration of the units list.
Version date: 2023-09-15
Users positions
Users positions
Configuration of the users positions list.
Version date: 2023-09-15